Open the Well Pump Generator Planner →Read the backup power guide
Free, no sign-up, runs in your browser at wellpump-generator-planner.pages.dev.
It answers
“What size generator do I need to run my well pump, furnace and fridge at the same time?” and “In what order should I turn things on so a smaller generator copes?”
You get
- Running total of everything checked
- Peak if you stagger starts vs. peak if everything starts at once
- A running rating (÷0.8) and a starting rating to look for
- A 240 V warning when a well pump is selected
- A start order, biggest surge first, ~10 s apart
- Amazon search links matched to your wattage band (affiliate, marked)
What to have ready (and where to find it)
| Input | Where to find it |
|---|---|
| Well pump volts, HP and amps | Pump control box near the pressure tank (3-wire pumps), installer paperwork, or the pump breaker (two-pole = 240 V). |
| Fridge and freezer amps | Label inside the door or on the back. |
| Furnace or boiler amps | Furnace or boiler data plate. Gas, propane and oil heat still need power for the blower or burner. |
| Anything else you must run | Sump pump, lights, Wi-Fi, chargers, medical devices: labels or a plug-in watt meter. |
| Soft start or constant-pressure drive? | Controller label or installer paperwork. If yes, set starting watts close to running watts. |
How the math works
running total = Σ running W of checked loads
largest surge = max(starting W − running W)
staggered peak = running total + largest surge
worst case = Σ starting W
recommended = running ≥ running total ÷ 0.8 (rounded up to 100 W)
starting ≥ staggered peak (rounded up to 100 W)
Worked example
With the planner’s default loads (½ HP pump 1,000/2,100 W, fridge 700/2,200 W, gas furnace blower 800/2,350 W, 10 LED lights 100 W, Wi-Fi 25 W; all planning figures estimate):
running total 2,625 W · staggered peak 4,175 W · all-at-once 6,775 W
→ look for ≈ 3,300 W running and ≈ 4,200 W starting
Limits to know
- Default watts are typical planning figures, not your equipment. Replace them with nameplate numbers.
- A well pump’s starting draw is often 2–3× running; motors with a soft start surge much less.
- The planner doesn’t design the house connection. A transfer switch or interlock must be chosen and installed by a licensed electrician. Never backfeed through a dryer outlet.
Run your own numbers
The full tool handles your exact loads and settings, with explanations next to every result.